Site Event/Activity record ESF25967 - Monitoring - Eyke S98 - Requisition Sewerage Scheme

Please read our .

Location

Location Eyke to Bromeswell
Grid reference Centred TM 3094 5175 (1754m by 459m)
Map sheet TM35SW

Technique(s)

Organisation

SCCAS

Date

Not recorded.

Map

Description

The line of the new sewerage pipe ran along The Street passing close to Eyke church. An additional length of new pipeline ran along Church Lane. The proposed length of popeline to the south of Eyke school was not lait. All new pipe-work in the village for this scheme was laid directly into narrow trenches c0.40m wide at the road edge. To the west of the village the remainder of this pipeline scheme ran through open county where an area some 7m wide was stripped of topsoil prior to pipe laying. The pipe line between TM20905189 and TM31605178 was not monitored. Over the remained of the pipeline scheme 6 monitoring visits were made to the village centre and 2 visits to the stripped length close to the River Deben. This monitoring work was carried out between April and Novemebr 1994, and funded by Anglian Water Services Ltd.

Sources/Archives (0)

Related Monuments/Buildings (1)

  • Eyke S98, Requisition Sewerage Scheme (Monument)

Record last edited

Mar 20 2019 3:26PM

Comments and Feedback

Do you have any more information about this record? Please feel free to comment with information and photographs, or ask any questions, using the "Disqus" tool below. Comments are moderated, and we aim to respond/publish as soon as possible.